Team Project Experience The following projects were completed by our team at ACM's predecessor firm, Franklet Enterprises:
|
 |
Seahawks Stadium, Seattle Washington
|
click photo to enlarge |

|
Seahawks Stadium under construction |
|
Project description: A
$500 million professional football stadium including a 200,000 square foot Exhibition Center, 2,000-car parking
garage, & a 72,000-seat Stadium on a 35-acre urban site previously occupied by the Kingdome. Site improvements included street improvements for approximately 2,400 lineal feet of adjacent public streets &
several plazas with public art installations. Utility work included a private
8-inch fire water service main with redundant connections to the public water main, a private 8-inch fire service for the
dry standpipe system, approximately 1,700 feet of public and private storm drain, and ductbanks for the primary electrical
service with redundant connections to separate substations. Completed 2001. Services Provided*: • Complete
Civil Design, Project Engineer
Architect:
Ellerbee Becket, Kansas City, MO.
*Civil engineering services provided under subcontract
to principal engineering consultant Skilling, Ward, Magnusson, Barkshire - Seattle, WA
|
Sea-Tac Airport Expansion- Seattle, Washington
|
click photo to enlarge |

|
SeaTac Passenger Terminal under construction |
|
Project Description*: $250 million passenger terminal expansion on a 22-acre site. Site improvements included relocation of 1,400 feet of the cargo and ground transportation access road with runoff
water quality treatment, retaining walls, and a ground transportation parking lot. Utility
work included relocation of existing 12- and 24-inch water mains and installation of new 12-inch water mains (2100 ft); storm
drainage (5100 ft) and industrial waste systems (2700 ft) with pump stations; sanitary sewers (2300 ft). click here for an article about this project on the Port of Seattle website Services*: • Complete Civil Design • Worked closely w/Port of Seattle
staff throughout project to ensure coordination of complex phasing and operational issues with several concurrent projects. • Design phasing maintained existing infrastructure without compromising
existing airport operations. *Civil work was performed under subcontract to principal engineering consultant firm Skilling,
Ward, Magnusson, Barkshire - Seattle, WA
|
Everett Arena - Everett Washington
|
click photo to enlarge |

|
Everet Arena |
|
Project Description*:
A $50 million, 10,000-seat hockey arena that included a separate public ice rink.
Site improvements included street improvements for the public streets surrounding the urban site, a parking lot with
controlled access, public plazas, and multiple retaining walls on the sloped site. Services Provided*: • Complete
Civil Design, Project Engineer
*
Civil engineering services provided under subcontract to principal engineering consultant Skilling, Ward, Magnusson, Barkshire
- Seattle, WA
|
Northwest Airlines Hangar and Cargo Facility
at SeaTac International Airport, Washington
|
|
Project description*: A $50 million hangar and air cargo facility located on a 15-acre site directly south of STEP. Site improvements
included AOA pavement, a parking lot with a loading dock, and above-ground tanks for dispensing of glycol and diesel fuel. Utility work included a 20,000 GPM fire water service, a storm drainage system with
a wet vault for runoff water quality treatment, and an industrial waste system with capacity for the fire sprinkler deluge
system. click here for an article about this project on the Port of Seattle website Services Provided*: • Complete
Civil Design • Coordinated the design of all utilities and site improvements with SeaTac's South Terminal Expansion
Project (STEP) and other adjacent Port of Seattle projects. * Civil Engineering Services were provided
under contract to principal consultant firm Skilling, Ward, Magnusson, Barkshire - Seattle, WA
|
Snohomish Country Record Storage Building - Everett, Washington
|
|
Project description: Design and construct a 40,000 square-foot records and evidence storage facility on an exisitng urban site for
the Snohomish County Sherrif's Office and the
county’s record storage division of the Department of Information Services. Project Cost 1.6 million. Services Provided*: • Complete
Civil Design Architect: Dykeman Architects, Everett, WA *Civil
engineering Services provided under subcontract to principal engineering consultant Skilling, Ward, Magnusson, Barkshire -
Seattle, WA
|
Bellevue Community College Expansion - Bellevue, Washington
|
click photo to enlarge |

|
|
Project description: Existing Building A expansion and remodel Services Provided*: • Complete
Civil Design *Civil engineering
Services provided under subcontract to principal engineering consultant Skilling, Ward, Magnusson, Barkshire - Seattle, WA
|
Meydenbauer Hotels & Office Towers - Bellevue, Washington
|
click photo to enlarge |

|
|
Project description: A high rise office tower on large a urban site.
Services Provided*: • Complete
Civil Design *Civil engineering
Services provided under subcontract to principal engineering consultant Skilling, Ward, Magnusson, Barkshire - Seattle, WA
|
Various Outdoor Shopping Malls - Anaheim Gardenwalk Mall
(CA), University Village Mall (WA), Flat Iron Village Mall (CO)
|
|
|
Shell Gas Station - Mill Creek, Washington
|
click photo to enlarge |

|
|
Project Description: Design
gas station site including UST location
Services: • Environmental Engineering Design for UST Remediation •
Complete Civil Design
*Project completed
while staff member was previosuly employed at Summit Envirosolutions of Bellevue, WA
|
Safeco Field - Seattle, Washington
|
click photo to enlarge |

|
|
Project description: A
professional baseball stadium on an urban site previously occupied by warehouses, factories, and commercial buildings. Site improvements included street improvements for approximately 1,500 lineal feet
of adjacent public streets. Services Provided*: • Designed
field access gate Architect: NBBJ, Seattle, WA *Civil
engineering services provided while staff member was employed by Summit Technologies, Seattle, WA
|
Landslide Repairs, Dredging and Seawall Repairs - Washington
State
|
click photo to enlarge |

|
Bangor Washington Submarine Facility |
|
<< click photo to enlarge Project Description*: Landslide
repair - Miscellaneous landslide repair projects for the City of Seattle
under a fast-track time line using emergency funding. Designed included approx.
450 lf of soldier pile retaining walls, raods, utilities, including the design for replacement storm, sanitary, and water
mains. Dredging & Seawall Repair
- Dredging and seawall repair for U.S. Navy K/B Dock in Bangor,
WA. Services*: • Civil Design Services *Civil services were provided while staff member was previosuly employed by Summit Technologies
- Seattle, WA
|
Container Shipping Terminals - Seattle, Washington
|
|
Project Description*:
Prepared pavement designs and drainage plans for international container shipping terminals. Services
Provided*: • Prepared pavement designs and drainage plans. • Coordinated with South American firms involved in project * Civil engineering services provided while staff member was previously employed by Summit
Technologies - Seattle, WA
|
Tolt River Pipeline, Washington State
|
|
Project description*: Large diameter pipeline project Services Provided*: • Civil
Design Support Services *
Civil Engineering Services were provided while staff member was previously employed by Summit Technologies - Seattle, WA
|
University of Washington Fisheries and Oceanography
Buildings - Seattle, Washington
|
click photo to enlarge |

|
UW Fisheries Science Building |
|
Project description*: Design site utilities and improvements for University Buildings on a
fast-track schedule amid budget cuts and during ongoing construction Services
Provided*: • Design Site Utilities * Civil Engineering
Services were provided while staff member was previously employed by Summit Technologies - Seattle, WA
|
Asarco Superfund Site Remediation - Tacoma, Washington
|
|
Project Description: Remediation of arsenic contamination at Asarco Copper smelter facilities
in Ruston, Washington, an EPA superfund site. Services
Provided*: • Environmental Engineering Design *Environmental
engineering services provided while staff member was previosuly employed at Science Applications International Corporation
- Bothell, WA
|
|
 |
|
 |
|
 |
|
|
ACM ENGINEERING PO Box 8701 • Bend, OR 97708 P: 541-728-3456
• F:541-610-1709 • E:info@acm-engineering.com
|
|
|
 |